Branch Circuit Monitoring
Real-time power usage monitoring across all cabinets
Critical Power Alerts
There are critical power situations that require immediate attention. Review the alerts below.
Filters:
Power Usage Summary
Last 30 days power consumption across all monitored circuits
Absolute Peak
Critical94.2 AMarch 1, 02:15 AM
Recorded on Cabinet DD-2 (94.2% of capacity)
Average Load
Warning52.8 A(65.2% of capacity)
2.3% lower than previous 30 days
Threshold Violations
17
Critical (>80%)
42
Warning (>40%)
59
Total Events
Longest critical event: 32 minutes on Feb 28
Cabinet AA-1
SV1 - San JoseCircuit A
19.2 A
(32%)
Circuit B
18.6 A
(31%)
Aggregate Load
Threshold: 80%
63%
8.31 kW
Cabinet BB-3
SV1 - San JoseCircuit A
27.6 A
(46%)
Circuit B
26.4 A
(44%)
Aggregate Load
Threshold: 80%
90%
11.88 kW
Active Alerts
Aggregate load approaching 90% threshold
Circuit A load exceeding 40% redundancy threshold
Cabinet CC-7
EQ-DC11 - AshburnCircuit A
18.2 A
(23%)
Circuit B
36.8 A
(46%)
Aggregate Load
Threshold: 80%
69%
12.1 kW
Active Alerts
Circuit imbalance detected: B-side 46%, A-side 23%
Circuit B load exceeding 40% redundancy threshold
Cabinet DD-2
SV1 - San JoseCircuit A
42.4 A
(42.4%)
Circuit B
43.2 A
(43.2%)
Aggregate Load
Threshold: 80%
85.6%
18.83 kW
Active Alerts
Total load exceeding 80% aggregate threshold
Circuit A and B both exceeding 40% redundancy threshold
+1 more alerts
Cabinet FF-4
Digital DFW-10 - DallasCircuit A
16.8 A
(28%)
Circuit B
15.6 A
(26%)
Aggregate Load
Threshold: 80%
54%
7.13 kW
Add New Cabinet
Power Threshold Guidelines
Normal Load (0-40%)
Safe operating range for redundant power. Each circuit can safely support full load if the other fails.
Warning Load (40-80%)
Reduced redundancy. Circuits approaching 40% individually or 80% aggregate may not support full failover.
Critical Load (>80%)
Risk of breaker trip. Circuit loads exceeding 80% aggregate or severe imbalance may cause service disruption.